ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

As a project manager, what procedure would you utilize for an effective EOT Claim if during construction the project EMP Design was changed by Client?

user-image
تم إضافة السؤال من قبل Samir Salileh , Project Manager, Riyadh , Formerly @ CIMS Project Management Consultancy-looking new opportunity
تاريخ النشر: 2017/02/11
يوسف دمدوم
من قبل يوسف دمدوم , مهندس و مسير , مقاولة اشغال البناء

Thank you for the invitation

Depending on the extent of the impact of these changes required by the client on the remaining period it was the period shall not affect the duration of achievement that's okay

Alternatively, if affected in the period, the client assumes that by increasing duration and expenses

Krishna   KHASANIS  PMP
من قبل Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

EOT in general can be claimed by proving delays with reference to Client Approved Baseline/s & accurate program revisions & updates. But it is easily said than done in case of mega or complex projects with many interfaces and thousands of activities .

As far EMP projects , I have no exposure whatsoever to EMP projects.

 

Abdul Rehman
من قبل Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thank you for the invitation. Sorry, I have no knowledge about it.

vikyath chandrashekaraiah
من قبل vikyath chandrashekaraiah , propretor , siri electricals

Planning of daily schedules with other agencies like civil,A.C,Plumbing etc. Planning of works related materials for the excecution of daily routine works. Planning of Man power and job allotment

hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

 

Thank you for the invitation

I agree with colleagues answer

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟