The term baseline is used in both disciplines project management and configuration management. Which statement is not true?

A. Baselines in system configurations are often also referred to as deltas.B. In configuration management, baselines are used to control change.C. Project management baselines are used for performance measurement.D. In project management, baselines help assess variance and trends.

user-image
تم إضافة السؤال من قبل DR MD ANWAR HOSSAIN , Moderator , bayt.com
تاريخ النشر: 2016/10/12
Ahmed Hassan
من قبل Ahmed Hassan , Service Delivery Manager , Goodnews4me

A. Baselines cannot be deltas.

'Delta' means difference.

 

Jeams Cole
من قبل Jeams Cole , Joint Chiefs of Staff (JCS) , Joint Chiefs of Staff (JCS)

In both project management and configuration management, the term “baseline” is used to refer to a specific version of a product or plan that has been formally reviewed and approved, and serves as a basis for future development and comparison.

In project management, a baseline is typically established for the project scope, schedule, and cost at the beginning of the project, and may be updated as changes are made to the project. These baselines provide a reference point for measuring progress and identifying deviations from the original plan.

In configuration management, a baseline is used to establish a known, controlled version of a product or system at a particular point in time. This baseline can then be used as a reference for future development and maintenance activities.

One statement that is not true about baselines in these disciplines is:

  • A baseline cannot be changed once it has been established.

While baselines are intended to provide a stable foundation for future work, they can and often are changed as necessary to accommodate changes in project requirements or system functionality. However, any changes to a baseline must go through a formal change control process to ensure that they are properly documented, reviewed, and approved before being implemented.

Shaher Bano
من قبل Shaher Bano

Yes, It is the greatest way to learn many things. It is a Base on the discipline.

Geronimo  Santiago
من قبل Geronimo Santiago , Project Quantity Surveyor , MGM Construction (Local Company)

baseline term commonly use in estimation, BOQ

hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Option A

Baseline cannot be deltas

Thanks for invitation

mamoun mokhtar
من قبل mamoun mokhtar , general manager , albyan technical foungary

a base line is used always to control  deviations