Discussions Populaires Dans la Communauté Contrôle de projet

S'abonner

Questionnez la Communauté


Ask any professional question and get answers from other specialists.

Stream language
Haitham Qasem's image
La question a été ajoutée par Haitham Qasem finance assistant islamic relief yemen
Depuis 11 mois
Réponses:
1
Adeptes:
Vues:
74
Vote Count:
0
La réponse doit contenir un minimum de 25 caractères.
Default profile image
La question a été ajoutée par Muhammad Farooq QA-QC MANAGER AL Bawani contracting co.
Depuis 5 années

The term Baseline is used in both disciplines Project management and Configuration management. Which statement is not true? ‎

A. Project management baselines are used for performance measurement. B. In configuration management, baselines are used to control change. C. In project management, base‎ ... Voir Plus

Réponses:
2
Adeptes:
Vues:
169
Vote Count:
0
La réponse doit contenir un minimum de 25 caractères.
ZULFIQAR ALI's image
La question a été ajoutée par ZULFIQAR ALI Planning/ Project Control Manager King Abdullah University Of Science And Technology
Depuis 6 années

Which is normally not regarded as an element of cost of quality?‎

A. Prevention costs B. Maintenance cost C. Appraisal costs D. Failure costs‎

Réponses:
9
Adeptes:
Vues:
16
Vote Count:
4
La réponse doit contenir un minimum de 25 caractères.
Basit Ali's image
La question a été ajoutée par Basit Ali Director of Engineering Laverda Suites & Villas / Blue Bay Resorts
Depuis 9 années
Réponses:
23
Adeptes:
Vues:
1012
Vote Count:
12
La réponse doit contenir un minimum de 25 caractères.
Ahmed Khater's image
La question a été ajoutée par Ahmed Khater ID& Fit- Out Construction Manager Harmony Atelier Interior Design& Decoration
Depuis 8 années
Réponses:
76
Adeptes:
Vues:
833
Vote Count:
8
La réponse doit contenir un minimum de 25 caractères.
Default profile image
La question a été ajoutée par Muhammad Farooq QA-QC MANAGER AL Bawani contracting co.
Depuis 5 années

Which of the following BEST describes when you perform the Monitor and Control Project Work process? ‎

A. As soon as every deliverable is completed B. Continuously throughout the project C. At scheduled milestones or intervals during the project D. At the end of every proj‎ ... Voir Plus

Réponses:
3
Adeptes:
Vues:
406
Vote Count:
0
La réponse doit contenir un minimum de 25 caractères.
Default profile image
La question a été ajoutée par Muhammad Farooq QA-QC MANAGER AL Bawani contracting co.
Depuis 5 années

You're managing a project that is currently executing. You're evaluating the work being performed by constantly measuring the project performance,?‎

and recommending changes, repairs and corrections where necessary. What process are you performing? A. Scope Control B. Monitor & Control Project Work C. Integrated C‎ ... Voir Plus

Réponses:
2
Adeptes:
Vues:
58
Vote Count:
0
La réponse doit contenir un minimum de 25 caractères.
ZULFIQAR ALI's image
La question a été ajoutée par ZULFIQAR ALI Planning/ Project Control Manager King Abdullah University Of Science And Technology
Depuis 6 années

Earned Value Analysis is used to measure performance based on the following parameters?‎

A. Scope and Cost B. Scope and Schedule C. Scope, Cost and Schedule D. Cost and Schedule‎

Réponses:
3
Adeptes:
Vues:
76
Vote Count:
3
La réponse doit contenir un minimum de 25 caractères.
Default profile image
La question a été ajoutée par Muhammad Farooq QA-QC MANAGER AL Bawani contracting co.
Depuis 5 années

Which of the following is the correct order of the Monitoring & Controlling processes for Scope Management?‎

A. First Scope Verification, then Scope Control B. First Scope Control, then Scope Verification C. There is not enough information to decide D. Both happen simultaneously‎

Réponses:
1
Adeptes:
Vues:
72
Vote Count:
0
La réponse doit contenir un minimum de 25 caractères.