Question ajoutée par Bassam Nawasreh , Senior Bidding Specialist , Jeraisy Compyter & Communications Services
Date de publication: 2015/12/31
Hazem Mattar
par Hazem Mattar , Project Manager , Egyptian Engineers

The lowest price is not a refrence where the client can refer to and tender evaluation shall be conducted including the technical and commercial evaluations for the tendors. However the client can assign a cost consultant to prepare a cost estimate which shall be the refrence and to the tender comparisons. The cost estimat shall be prepared on the market testing or benchmarking for updated prices.

Osama Setohy MCIOB
par Osama Setohy MCIOB , Senior Quantity Surveyor , Keo International Consultants - Qatar

If he failed to get a good rank in the technical qualification.

Sheikh Ashfaq
par Sheikh Ashfaq , Customer Sales Representative , ADOS PAKISTAN LIMITED

1. If bidder could not offer the items as per customer BOQ.

2. If technically disqualified.

3. If Delivery time excced than the required time.

4. If Bid Bond could not be presented. 

5. If Bidder don't have experience for the specific product.

Yassin Al Turk
par Yassin Al Turk , Human Resources HR Representative (HR Representative) , csb

HE SHOULD NOT TAKE THE LOWEST PRICE :

1- IF THE QUOTATION SPEC BELOW THE SPECS HE ASKED FOR .

2- IF THE IS NO RECORD FOR THE BIDDER IN THE MARKET (IT COULD BE A RISK).

 

Abdellah Tarek Deffous
par Abdellah Tarek Deffous , Senior Purchasing Engineer , BP EXPLORATION ALGERIA (joint venture BP,Statoil & Sonatrach)

if proposed goods are not technicly acceptebale