What is the major aspect you will look at before preparing method statement for Steel Reinforcement?

user-image
Question added by Jawad Ali , QC Inspector/Architecture , Saudi Arabian Baytur
Date Posted: 2017/07/27
Venkatesa Perumal Balu
by Venkatesa Perumal Balu , Construction Manager , Cairn India Ltd

Whether we have the latest revised drawings for ensuring the type of reinforcements to be used in the particular project site as per soil investigation reports

 

Tharabai Jayaprakaash
by Tharabai Jayaprakaash , Lab Instructor , Jaya Engineering College

preparation of the substrate prior to repair will often determine whether a repair project is ,

  • critical aspects of durability of concrete repairs and
  • overlays is a lasting and,
  • Common surface

preparation methods include

  • mechanical roughening and
  • blast  thawing or thermal movements
  • and corrosion of steel reinforcement.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.