What is the major aspect you will look at before preparing method statement for Steel Reinforcement?

user-image
Question ajoutée par Jawad Ali , QA/QC Inspector Civil Architecture , Salini Saudi Arabia
Date de publication: 2017/07/27
Venkatesa Perumal Balu
par Venkatesa Perumal Balu , Construction Manager , Cairn India Ltd

Whether we have the latest revised drawings for ensuring the type of reinforcements to be used in the particular project site as per soil investigation reports

 

Tharabai Jayaprakaash
par Tharabai Jayaprakaash , Lab Instructor , Jaya Engineering College

preparation of the substrate prior to repair will often determine whether a repair project is ,

  • critical aspects of durability of concrete repairs and
  • overlays is a lasting and,
  • Common surface

preparation methods include

  • mechanical roughening and
  • blast  thawing or thermal movements
  • and corrosion of steel reinforcement.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?