What is the standard outer length of a loading platform on high levels of building structure and how it can be strengthened if there is no roof?

user-image
Question added by Syed Nasir Shah mushwani , SAFETY SUPERVISOR , SAUDI PAN KINGDOM (SAPAC)
Date Posted: 2015/11/05
Venkatesh Ramaswamy
by Venkatesh Ramaswamy , Trainee Engineer , Express Highway

The best thing to do would be to engage a Professional Engineer who is competent, experienced and qualified to provide answer. This appears to be a Temporary Construction to facilitate the actual installations. All temporary construction that facilitates actual construction., eg., loading platforms, formwork, scaffolding etc should be designed by a competent person and checked by an authorized examiner at site. The role of construction safety professionals and project manager should be to ensure the right process is followed.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.