Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

In production managements which the most important to reduce cost or increased production or both?

user-image
Question added by Rami Assaf , Plant Manager , Al Manaseer group
Date Posted: 2014/08/07
samer maher
by samer maher , Senior Operations Manager , El Badry

Reduce coct and increased production v.important in production management and also if we increase productivity will reduce cost also if we reduce costs will increase the profit which leads to success the production management

Mohamed Abd Elghany Ali
by Mohamed Abd Elghany Ali , QHSE Senior Engineer , Sidi Krir Power plant 3&4 a 680 MW natural gas-fire power complex(EDRA Power Holdings SdnBhd).

Number one in the production to reduce the cost and increase the production is the safety .. always make safety first because the production in the safe area decrease the cost and give the best production 

Abdulrahman Salamah
by Abdulrahman Salamah , مكتب الصيانة , الكلية التقنية بجدة

The main point for production management is to ncrease profits.

 

To reduce the amount of payment and accomplish profits, and by planning comes the increased production, and eventually we can produce more with least amount of price.

 

 

Mohamed Mahmoud  Abdel Wahab
by Mohamed Mahmoud Abdel Wahab , Production Manager , Agthia Agri Business Division

In production managements

  • reduce the cost 
  • Products quality
  • increased production
  • Production planing 
  • If the materials used in the production good must be the products  good

In production managements the most important to reduce cost and increase production is maintenance of machines,good working environment with safety and skill operator.

mohd asghar raza asgharpasha
by mohd asghar raza asgharpasha , trainee engineer , hbl power systems ltd

If one has to consider and value the cost reduction in production management can be detailed as under

1. Quality Management has to be ensured but at the same time has to manage the cost of the same

in individual Validation of materials that integrate the unit as such.

2. Store management has to ensured and constant check has to be control through regular Audits

3. Engineering dept has to join hands on with the optional designs as per ISO standards which meet the requirement of the customer.

4. R&D dept has to contribute to the Mil standards for the products and ensure the same.

5. PPM i.e., planned and preventive maintenance has to ensured by the HOD's of the several depts on whole.

                             Hope you have got some idea as provided on ur request.

sheharyar ameen
by sheharyar ameen , Sales Application Engineer (Export Sales & TSS) , KSB Pumps Company Limited

correct cutting plan of sheet / plate

good develop size of part 

production layout 

production system

good material procurment system

ETC.

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.