ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

How do I transfer Material from plant to plant through SAP System ?

user-image
تم إضافة السؤال من قبل YOUSEF ASHOUR , Fleet Administration Officer , Almarai Company
تاريخ النشر: 2015/07/30
Mohamed Irfan -CISCP/CISCM
من قبل Mohamed Irfan -CISCP/CISCM , Director of Supply Chain , FWTT

Yes use  MB1B command to transfer plant to plant  ..........                   ........                         ...... 

Shabbir Nazir
من قبل Shabbir Nazir , Raw Material Store Supervisor , Nippon Paint Pakistan

we can transfer material from plant to plant though sap system by using the command (mb1b) then enter material slip # , doc.header tex , movement type , plant code , reason for movement then storage location press enter and give Rcvg SLoc.

Manendra Kumar Mishra
من قبل Manendra Kumar Mishra , Tenure , Robert Bosch Engineering and Business Solutions Ltd

We have to use MB1B (Transfer Posting) for transferring posting

There are1 step and two step procedure for stock transfer.

In1 step the stock removal and stock posting will be done by using1 movement type.

In2 step procedure,stock removal and stock posting will be done by using2 movement types.

Before doing MB1b make sure that the material is available in both the plants

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟