ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What steps should be taken to measure good quality System in any Corrugator Plant.

How we can measure any Corrugator Plant Quality system

user-image
تم إضافة السؤال من قبل Muhammad Arshad , Management Consultant General Manager , Tummina Paper Industries Miisrata.Libya
تاريخ النشر: 2013/06/06
Mohamed Nour
من قبل Mohamed Nour , Site manger , American International Contractors

how effective it is in being preventive and not only corrective

Santosh Menon
من قبل Santosh Menon , Manager Projects-MEPI , Oman Shapoorji LLc

Project Quality Plan to be implemented for the Project & proper checks to be introduced in the Quality Plan. 

Malek Yaghi
من قبل Malek Yaghi , Production Manager & QC Manager , ASIA DETERGENTS IND.

1- It is necessary to implement the quality policy.

2- It is necessary to apply the Internal Audit within the company

3- external audit of the donor to testify

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟