Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What are labour productivity calculations/norm in construction works? If possible Please provide a link for detail information.

How much concreting a mason and helper can do in a full working day.? How many labour is required for brickwork, plaster, excavation, reinforcement per standard unit.?

user-image
Question ajoutée par Shaikh sayeed , Civil Engineer , Al Sahel Construction Company
Date de publication: 2014/03/17
Gul Rehman Kayani
par Gul Rehman Kayani , Manager Cost and Contracts , CGICOP

There are many theoratical norms for productivity of equipment and manpower.

If you go through product manual of any equipment there is always a cruve drawn which relates the production to equipment depreciation and nature of product, e.g. a dozer6000 hours used under good maintaince backup can haul2.5 m3 to65 M3 up to20 m lead per hour depending on the denisty of materials to be hauled.

Manpower productivity varies with the weather conditions, average age of manpower, nutration level, living conditions and assigning edequate resources.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?