Utilities and Traffic diversions
Which may lead to the removal of some obstacles that may be interests of citizens, so design must take into account the interests of citizens
1-DESIGNING AS PER EXISTING STRUCTURE & UTILITIES
2-DESIGNING EXIT/ENTRY LOCATION
3-COST OF PROJECT
1- Design of the lines and stations, considering exsiting constructions & utilities
2- soil & water conditions
3- Allocating of area in urban
I think most imortant thing taking old foundation un considration.
don`t cause traffic at any where
saftey of people and houses
As per my knowledge, mobilization of ambulances, Life risk involvement, huge complex of engineering design and implimentation as analysis of drawing routin, and huge capital cost.
Following Problems will be faced...
1. Huge capital cost
2. Complex engineering designing
3. Big Disturbance for the people of city. like obstacles in transportations, electricity disturbance, gass disturbance.
4. Allot of issues for the mobilization of ambulances
5. Life risk involved much
many many others just wrote some in above....
But all issues can be tackled with good planning and better HSE...
the main problems how to determine the suitable path to avoid exisiting services and othe opstructions