What are the main problems of designing a metro in an existing city?

user-image
Question added by Dana Adel , Sales Representative , Karmalite
Date Posted: 2018/02/06
Rajasekhar Reddy
by Rajasekhar Reddy , Sr. Planning Engineer , Egis Rail

Utilities and Traffic diversions 

Mosab Badr
by Mosab Badr , Site Civil Engineer , EL AMANA for Construction"EL-Shrouk city"

Which may lead to the removal of some obstacles that may be interests of citizens, so design must take into account the interests of citizens

Mohammed  Wasim Uddin
by Mohammed Wasim Uddin , Qa/qc Civil Inspector , WSP International

 

1-DESIGNING AS PER EXISTING STRUCTURE & UTILITIES

2-DESIGNING EXIT/ENTRY LOCATION 

3-COST OF PROJECT 

Hamidreza Maghami
by Hamidreza Maghami , Project Manager , CVR Consulting Eng.

1- Design of the lines and stations, considering exsiting constructions & utilities

2- soil & water conditions

3- Allocating of area in urban 

sleem  orabi
by sleem orabi , Site Project Manager , Sarayya construction company

I think most imortant thing taking old foundation un considration.

don`t cause traffic at any where

saftey of people and houses

Sunnykumar Patel
by Sunnykumar Patel , Maintenance Manager , Prestige Group Nigeria

As per my knowledge, mobilization of ambulances, Life risk involvement, huge complex of engineering design and implimentation as analysis of drawing routin, and huge capital cost.

Amer Abbas Shaker
by Amer Abbas Shaker , Site Manager (Owner Engineer) , Renewable Resources (Pvt.) Limited (JV with Tractebel : Germany)

Following Problems will be faced...

1. Huge capital cost

2. Complex engineering designing

3. Big Disturbance for the people of city. like obstacles in transportations, electricity disturbance, gass disturbance.

4. Allot of issues for the mobilization of ambulances

5. Life risk involved much 

many many others just wrote some in above....

But all issues can be tackled with good planning and better HSE...

hatem labib
by hatem labib , Quality control manager , MISER consultant

the main problems  how to determine the suitable path to avoid exisiting services and othe opstructions