Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is the cost of conformance and non-conformance of a Project?

user-image
Question ajoutée par Joefil C. Jocson , CEO/President , Dyas Construction and Management Consultants
Date de publication: 2013/09/27
samir abdulrahim
par samir abdulrahim , Senior Telecom & IT Consultant , STC

There are two separate components within Cost of Quality (COQ) . One is the Cost of Nonconformance, which is the money (and time) that will be spent due to the failure of a deliverable from your project. The other is the Cost of Conformance. This is the figure that is determined to be necessary to avoid those failures in the first place. There are two categories within the Cost of Conformance. The prevention costs are those associated with building a quality product or service so that any errors are within the range that is considered acceptable. These usually include the elements of training and equipment. Also included in this category is the time and effort required to fully document processes and to do things the right way. The other category within the Cost of Conformance is the appraisal costs. These are the costs associated with determining the level of quality to ensure it meets the required standards. Appraisal costs include things like inspections and various types of testing that are then evaluated to ensure the quality expectations are being met.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?