Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

When the HAZOP study has to be updated or reviewed on which bases?

user-image
Question ajoutée par Mohsen Maamouri , Senior HSE Engineer , eni tunisia
Date de publication: 2015/12/29
Adnan Manzoor
par Adnan Manzoor , Project Engineering Leader , BERKELEY ENGINEERING CONSULTANTS

HAZOP is a Hazard & Operability study carried during conceptual and various designing stages of a project. HAZOP study need to be updated or reviewed again whenever there is a change in the design or process at any stage of the project  

MOHAMMAD M NOMANI
par MOHAMMAD M NOMANI , Senior Safety Engineer , Oryx-GTL-Qatar

HAZOP STUDY SHALL BE DONE BEFORE COMMISSIONING

AFTER COMMISSIONING EVERY 5 YEARS

Faraz Hussain Mughal
par Faraz Hussain Mughal , Sr. Operations & Commissioning, Project Support Engineer , United Energy Pakistan Formerly British Petroleum

Retrospective hazop to be performed after every 5 years irrespective of any major change in plant or process. HZAOP  is critical Tier-1 documents has to be updated after every 5 years to ensure plant/process integrity is compromized.

HARISH KUMAR
par HARISH KUMAR , Process Engineer , Gulf Spic General Trading and Contracting Company., WLL

HAZOP Stands for Hazard and Operability studies. All the Hazop study recommendations needs to be suitably closed and Issue the HAZOP Close-out report. If required Assessment of Hazop close-out study need to be performed before the Mechanical Completion/Provisional Turn over.

Shamsul Bahri Alias
par Shamsul Bahri Alias , Project Operation Manager , BASF Petronas Chemicals

Once any process changes require.

Depend on the country every 5 years for critical process and 10 for non critical process

Uday Surya Gupta
par Uday Surya Gupta , Simon Carves India Ltd

 HAZOP study need to be updated or reviewed again whenever there is a change in the design or process at any stage of the project. Usually outcome of the HAZOP study is to be updated before design and engineering issues are finalized.

Mohd Shahnawaz Siddiqui
par Mohd Shahnawaz Siddiqui , Senior Process Engineer II , Akersolutions Engineering Malaysia

HAZOP normally carried out after P&ID is issued for the IFC, so that the comments which are justifiable regarding the safe aspect shall be incorporated to reduce the major comment during the HAZOP and Safe design.

DUNCAN TODD
par DUNCAN TODD , Loss Prevention Engineer , SAUDI ARAMCO

If there is a plan to introduce new equipment into operating facilities. Assessments must be completed to show potential risks or inadvertent possibilities with the introduction of this new equipment.

Jessie Chua
par Jessie Chua , Refinery Shift Superintendent , ENOC

Hazop study is to be updated or reviewed whenever there is a change or modification in the design, process conditions, equipment, raw material and procedures.

Roy Stanley Amuegbunem
par Roy Stanley Amuegbunem , Senior HSE Specialist , Consolidation Engineering Khatib & Alami

When there are changes or modifications to equipment, procedures, raw materials, and processing conditions other than "replacement in kind."

For example, the operating procedures contain the operating paramaters (pressure limits, temperature ranges, flow rates, etc.) and the importance of operating within these limits. While the operator must have the flexibility to maintain safe operation within the established parameters, any operation outside of these parameters will result from changes in production rates which then requires review and update of the HAZOP studies with approval by a written management of change procedure.

Mohamed  Karem Mahmoud
par Mohamed Karem Mahmoud , HSE Engineer , Suez canal containter terminal

depends on process circumestances 

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?