Can we concrete pouring columns without Tower crane length of building is 2555 ft and width is 652 ft. Nos of columns are 256 With Five Floor each ?

user-image
Question ajoutée par AMIR RAMAY , Project Manager , Bahria Town ( Pvt ) Ltd.
Date de publication: 2015/08/14
Ali Ahmed Abdurahman Al-kubati
par Ali Ahmed Abdurahman Al-kubati , مدير المشتريات وادارة العقود في المشاريع ومساعد مدير المشروع , Ministry of Public Works and Highways

we can not concrete pouring columns without tower crane with such  of  building size

 

edzon Lejano
par edzon Lejano , 2d designer , Kobeco Concept

let me get things clarified..you want to pour concrete on columns. the no. of columns to be concreted is 256. do you want it simultaneously be poured? and secondly five floor each? that i was confused.. maybe the structure, the building in this case having five levels. i want to know is this the first lift?? if it is, we can pour concrete on it. we will be using pumpcrete. but i cannot guarantee you that we can pour the 256 columns in one phase

Teodoro Quides
par Teodoro Quides , Materials Engineer , Bayt El Khibra Engineering Consultants

No, definitely not. Tower crane is absolutely necessary for structural integrity and productivity.

Ahilan R
par Ahilan R , Scientific Assistant-D , Nuclear Power Corporation of India Ltd (NPCIL)

Towe crane will make your work much easier.