Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What is risk assessment at the time of tower crane lifting ?

user-image
Question ajoutée par Jahan shah , safety officer , Al muhaidibco
Date de publication: 2016/02/17
imee ray haight
par imee ray haight , Receptionist , The Skin Art Medical Center

risk assessment is when you identify the possible threat or hazard in a certain situation and come up  with preventive measures to avoid accident.

Elshazly Said
par Elshazly Said , VSAT & MW NOC Engineer , NANSC

 Incorrect lifting however, can lead to disastrous accidents. Every year, incorrect lifting procedures cause injuries, loss of work time and property. People, machinery, loads, methods and the work environment, are all important factors for correct lifting.

 

The "crane operator" is responsible for operating the crane correctly and safely.

He shall hold a valid crane operation certificate;

He shall be familiar with hand signals for communication.

 

For more information please read this: http://www.oshc.org.hk/others/bookshelf/CB952E.pdf 

TRAVEL RESTAINT SYSTEMS FALL ARREST HARNESS SYSTEMS EDGE PROTECTION SYSTEMS

 

Jahan shah
par Jahan shah , safety officer , Al muhaidibco

thanks guys for answer my question

 

Pasquale Esposito
par Pasquale Esposito , crew co ordinator , alpha logistics services (epz) ltd

Risk assessment while using a tower crane is where you identify what risks are involved and by doing that you can take preventive measures to minimize the risks

syed akbar khan
par syed akbar khan , accountant , Abro International Marketing Services Pakistan

travel restraint systems • fall-arrest harness systems • edge protection systems

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?