Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

As FMEA implementation aims to reduce RPN

Pick up the potential corrective actions 

A. Design changes

B. Engineered safety features

C. Safety devices

D. Warning devices

E. Procedures/training

F. All of the above 

user-image
Question ajoutée par LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)
Date de publication: 2015/02/01
Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

Most of them are correct, so

F. All of the above 

Fredy Makram Labib
par Fredy Makram Labib , R&D manager , Universal for home appliances

all the above actions ....

As Saleh
par As Saleh , Recruitment Manager , Saudi House Recruitment

I think All of the above actions 

Ridha SAIDANI
par Ridha SAIDANI , Maintenance Manager , SOMIPHOS / Technical Direction

The correct answer is : F. All of the above

Mohamed Galal Hussein Ahmed Mohamed
par Mohamed Galal Hussein Ahmed Mohamed , Technical Mnager , Fast Building Contracting Co.

I agree with all answers F- all of the above actions.

 

Mohamed Hamdy Kamal Riad
par Mohamed Hamdy Kamal Riad , Senior Solution Architect , IBM

Last Answer  : 

F. All of the above 

Option   F  (All of the above) is the correct option 

Elke Woofter
par Elke Woofter , Project Assistant , American Technical Associates

I believe the correct choice is Option F. All of the above

Wolf Klaas Kinsbergen
par Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

For reducing the Risk Priority Number I would look at F: all of the above

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?