The execution progress of your project has been found to be too slow. Which measure is most likely to immediately speed up the project?

 A  Technical training for all team members  B  Daily phone conferences and detailed reporting  C  A team meeting at a location convenient to all team members  D  Collocation of team members at a suitable place

user-image
Question ajoutée par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
Date de publication: 2015/01/17
Mohamed Galal Hussein Ahmed Mohamed
par Mohamed Galal Hussein Ahmed Mohamed , Technical Mnager , Fast Building Contracting Co.

I agree with Mr. Dahiya ; D

Irina Chepel
par Irina Chepel , Personal trainer , Freelancer

Fourth answer D.

Alex Al Yazouri
par Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

That's the best answer

D  Collocation of team members at a suitable place

Ibrahim Hussein Mayaleh
par Ibrahim Hussein Mayaleh , Sales & Business Consultant and Trainer , Self-employed

The first three are actually loosing the valuable time in the critical situation. I'll go with (D)

RAJ DAHIYA
par RAJ DAHIYA , Senior MEP Projects Manager , Trinity Engineering Services L.L.C.

 D.  Collocation of team members at a suitable place

Thanks for the invite

  D Collocation of team members at a suitable place

Answers wonderful friends

 

 

LABIB KOOLI
par LABIB KOOLI , Director of the Sectoral Center for Training in Hotel Technologies at Southern Hammamet , Tunisian Vocational Training Agency (ATFP)

Yeah as it is an urgent measure may lead to change 

Agree with you all 

Waqas Raza Khan
par Waqas Raza Khan , Accountant , Cold Store Group of Saudi Arabia

Option D is best Answer

USAMA YOSSRY AHMED GENDIA
par USAMA YOSSRY AHMED GENDIA , Resident Engineer , ACE ARAB CONSULANT ENGINEER - MOHARM BAKHOOM

I Useall of the above in addition to the follow-up field with daily reports and reports as well as weekly and monthly

Option  D

   Collocation of team members at a suitable place means setting objectives for each team member. As far as possible, these objective such be SMART - Specific Measurable Achievable Resourced Timed.