santy uriarte's image
Question added by santy uriarte Architect / Concept Architect /ADM Registered Architect Al Suweidi Engineering Consultants
9 years ago
Answers:
6
Followers:
Views:
214
Vote Count:
0
Answer should contain a minimum of 25 characters.
Dipak Das Dipak's image
Question added by Dipak Das Dipak General Manager (M), Power Tata Consulting Engineers Ltd
10 years ago

What is the necessity of punch-list preparation?‎

Pre-commissioning equipment & system installation checking‎

Answers:
3
Followers:
Views:
270
Vote Count:
0
Answer should contain a minimum of 25 characters.
Default profile image
Question added by Subodh Singh
6 years ago
Answers:
0
Followers:
Views:
0
Vote Count:
0
Answer should contain a minimum of 25 characters.
Tomas Gimenez's image  
Answer added by  Tomas Gimenez, Supervisor, Tepsi - Exterran
10 years ago

The necessity is to complete everything according to engineering, so with the preparation of a punch-list we have a document of what's missing, what's wrong and ... See More

Dennis Merrifield's image  
Answer added by  Dennis Merrifield
8 years ago

Obviously ,I would go for wall tiling first than floor tiling .If we prefer doing wall tiling later which would increase the chances of getting cracks on floor tiles at t ... See More

Mohammad Yosry Moussa Alshafe'y's image  
Answer added by  Mohammad Yosry Moussa Alshafe'y, Resident Engineer, Bluehaus Group
9 years ago

normally u should start by wall tiles without fixing the first row from below, then after finishing the flooring tiles , fix the first missing row above the floor tiles, ... See More

Azhar Bashir's image  
Answer added by  Azhar Bashir, Senior QA-QC Engineer, Al Arif Contracting Co
9 years ago

Definite wall because you have to put everything and also stand in washroom to fix the wall tiles, So if you put floor first, then applying wall tiles would definitely di ... See More

Default profile image  
Answer added by  Deleted user
9 years ago

The Wall first , because the floor need to be treated at last, since we have to put insulation component.So the floor must come last so the isulation components wouldn� ... See More