What is the method of calculation of water quantity in the concrete?

user-image
Question added by Attaullah shah , Sub Engineer , Pakistan Atomic Energy
Date Posted: 2014/01/16
SAMIH ABBAS KOTTACKAL
by SAMIH ABBAS KOTTACKAL , STRUCTURAL ENGINEER TRAINEE , CASE STRUCTURAL ENGINEERS

This is very good question and the most important part in site supervision,there are different ratio's used in various cases in which we would opt for water cement ratio (.4 to .6) according to is456.the following table is given in is456.If we take50kg cement then water to be taken would be50X.4 litres in the case of water cement ratio .4.we usually take .4 as water cement ratio in sites unless specified or different grades.I hope the answer is to the question please contact me for further clarification

Sl No.

Exposure

Plain Concrete

Reinforced Concrete

 

 

Minimum Cement Content kg/m2

Maximum Free Water-Cement Ratio

Minimum Grade of Concrete

Minimum Cement Content kg/m2

Maximum Free Water-Cement Ratio

Minimum Grade of Concrete

1

(2)

(3)

(4)

(5)

(6)

(7)

(8)

i)

Mild

220

0.60

-

300

0.55

M20

ii)

Moderate

240

0.60

M15

300

0.50

M25

iii)

Severe

250

0.50

M20

320

0.45

M30

iv)

Very Severe

260

0.45

M20

340

0.45

M35

v)

Extreme

280

0.40

M25

360

0.40

M40

 

Acoro Jean-Marie ACORO
by Acoro Jean-Marie ACORO , Group Chief Operating Officer , BATIPRO.sa

Your information is not wrong, but you must consider 

what is your environment (weather (hot/cold temperature), If you use adjuvents, The %W in your aggregates, your method of using for the implementing (pump, or non), and know what is the type of construction. Genéraly it's the laboratory who build the formulation.

Naveen Nishchal Pandey
by Naveen Nishchal Pandey , Site Engineer - Civil , Glair Infrastructure Limited

the50 kg bag cement is equivalent to35ltr

now water should be added40% to45% by volume

i.e. (40*35/100 or45*35/100) =14 to16 ltrs of water per cement bag

by knowing the no. of cement bags you can calculate the total volume of water required using this method

Mohammad Nemati
by Mohammad Nemati , manager , kuathar bana joonub

W/C (Water/Cement) Ratio Is Importanrt Factor To Obtaining The Volume Of Water.(Note:This Ratio Reversely Affects The Strength Of Concrete)

Ratio Equal To .2 Is Adequate For Intiating Of Cementation But Working With Concrete That Is Made Of This Ratio In Impossible Practically Becaase The Concrete Doesn't Have Workability.

According To International Codes Ratio Between .4-.45 Will Be Sufficient

pascal kobla anyidoho
by pascal kobla anyidoho , Block mason and gangleader , Iskan Group for trading and contracting W.L.L.

Although by visual observation, it is easy to tell if a batch of concrete is wetter than other previous batch. This visual test needs to be checked by more reliable methods to ensure greater accuracy. Such methods include slump test and compacting factor apparatus.

Gul Rehman Kayani
by Gul Rehman Kayani , Manager Cost and Contracts , CGICOP

to me Shefeek answer is more closer and simple to Quantity Takeoff purpose, for other design and QA QC purpose it need more detailed study then refereing to Stantards.

MOHAMMED ANWAR HOSSAIN (NICK NAME =CHOUDURY )
by MOHAMMED ANWAR HOSSAIN (NICK NAME =CHOUDURY ) , CIVIL ENGINEER , AL SADIH TRAD CONT

water cement ratio should be selected on basis of strength and workability requirements .Reproduced by permission of the American Concrete Institute from recomended practice for selecting proportions (A.C.I.613-54 ) 

When sulfate resisting cement is used ,maximum water cement ratio may be increased by0.5 gal per bag .

Abrar Hussain
by Abrar Hussain , Contract Manager , Sahara Tamiratt

Quantity of water required for various mixes of Plain or Reinforced concrete can be taken between8 to20 % of weight of Cement (50Kg or P/Bag) in Gallons utilization of water may decrease or increase as per the envoirnment in which Conrete is prepared. Allowance for wastage can be taken10 to15% if Concrete being mixed at Site.

hassan amer ali algaifi
by hassan amer ali algaifi , مهندس مشروع , مؤسئسة علي الحصان للمقاولات

the quesion is not clear.

if it means during mix design of concrete;

then water quantity can be calculated based on free water cement ratio (DOE method)

.

Attaullah shah
by Attaullah shah , Sub Engineer , Pakistan Atomic Energy

can we tak5% of aggregats and33% of cement for all ordinary concrete??????

 

Mohamed El Tablawy
by Mohamed El Tablawy , Senior Quantity Surveyor & Contract Administrator , SH Architects - Saleh Hamdy

(15-20%) water ratio.