You are a project manager at java ice cream factory. You are currently supervising the manufacturing of new flavor ice cream ?

java bean, burgundy crunch. The manufacturing of this flavor was proceeding as planned, until a manufacturing error occurred that requires corrective action to be taken. Ironically the manufacturing error resulted in a new variant of the flavor. Product team really thinks that flavor would be a success in a marketplace. They have asked you to cancel the corrective action, and integrate this serendipitous discovery in the manufacturing process. As a project manager you have realized that this has resulted in a change in project scope. Which of the following statement are true? A. Changes to the product scope should be in the project scope B. Changes to the product scope are a result of implementing corrective actions C. Changes to the product scope are defined in the integrated change control plan D. Workarounds are used to correct problems that occur with changes in the project scope

user-image
Question added by Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
Date Posted: 2019/01/16
Muhammad Farooq
by Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

A. Changes to the product scope should be in the project scope