How to improve the construction quality level by project supervision work?

user-image
Question added by Muhammad Saqib , Chinese Interpreter/Translator , CGGC
Date Posted: 2017/08/21
javed ahmed
by javed ahmed , Projects Manager , Delta Al Emirates cont llc

Main Factors are as follows

a. Quality plan and all guidance are followed including ITP, risk assesments etc

b. Quality drawings, method statments, procedures, specific details are very clear

c. Quality control and assurances to be under direct Mangement control

d.Strict compalince in all activities since day one

f.mock up , sample process to be followed for all applicable task to ensure the same approved quality is maintained 

g.importance to quality matters, rectifications on immediate manner willl help 

h. to be clear that all quality matters are time and cost oriented and will hit project handover and incur penalities

Zakir Chougle
by Zakir Chougle , Sr. Engineer , DAS Offshore Engg, Pvt Ltd

  1. To act as per the approved / certified QAP procedure of the project.
  2. Should have sufficient and skilled QA/QC team for the project.
  3. Have sufficient resource and instruments.

Ibrahim Alrashed
by Ibrahim Alrashed , Technical Advisor- CEO Office Director , TBC

In my opinion, to improve the construction quality level by the project supervision work we need to have a qualified staff and work plan to ensure that enhancing the quality assurance.

Muhammad Saqib
by Muhammad Saqib , Chinese Interpreter/Translator , CGGC

To improve the construction quality level by the project supervision work, following steps can be helpful:

1.       Indicating the weaknesses in any department or section in the company, and giving solutions to the top management of the company about those weaknesses;

2.       Suggesting new systems for quality management to serve the site work;

3.       Modifying the decisions of the site quality management, when necessary;

4.       Ensuring the quality of the design;

5.       Checking the construction team's requirements to be employed for the site;

6.       Giving advises that are concerned with the cost of the required quality;

7.       Improving the qualification of the company's personnel by training them on the quality management concepts;

8.       Choosing the work team to achieve the site quality management requirements;

9.       Establishing the suitable site quality system and giving the work team their responsibilities;

 

10.   Developing a computerized information center concerned with the site quality management of the construction projects. The purpose of this center is to keep documented all the quality management information to be used for cost analysis of any quality management decision.