André Hall
by André Hall , Production Supervisor / Engineering Management Trainee , Japan Tobacco International

By capturing and monitoring daily projected production activities taking cognisance of factors such as waste/rejections due to defective materials and/or quality control requirements with regards to tabacco quality assurance in order to achieve the minimum projected targets in alignment with todays PLC systems and equipment which targets are determined by the companies planning and production departments.

Production is the quantity required to fulfil sales orders.

 

Productivity is the speed of production and the O.E.E. target vaue is 95% of the maximum process speed. That is, if the process maximum is 400 pieces per hour, the minimum target is 380 pieces per hour.

 

I hope this is what you meant.

Mohammad Parvez Mohammed
by Mohammad Parvez Mohammed , Product Developement/Projects Manager , Jovae Industrial company Dammam

Minimum level of production is determined on the basis of cost involved for producing it, it should be equal to raw material and overhead expenses.

Vikas Dusane
by Vikas Dusane , Freelance Engineer , Self Employed

By studying the process & eliminating all the non value adding activities.

This will give the best minimum level of the production.

o n ashraf
by o n ashraf , Executive Manager , MLA

which covers your operation cost 

Aamir Aziz
by Aamir Aziz , Material / QAQC Engineer & Project Coordinator , Nascom Construction Private Limited

It depends on the Production Market Demand - and It depends on the Production Order. 

Mohammad Anwar Alam Anwar
by Mohammad Anwar Alam Anwar , Internal Systerm Auditor/Quality Auditor , Nada Dairy

Minimum level of production is collective output in terms of intermediate & finished goods against pre-defined target and OEE.

Imad Ullah
by Imad Ullah , Owner , Imad Block Factory

evry thing depends on product....

Djamel Laoudi
by Djamel Laoudi , R&D Manager , Petrogel

Cela dépend du résultat net que l'on veut obtenir en fonction des charges et du niveau d'activité.

saharsh changole
by saharsh changole , Trainee Engineer , M/s Friends Industries

-As production is being carried out when there is any order for the particular product.

-As there where variety of components as soon as the order is placed production is carried out.

-Totally depends upon what type of component is, and how much  no. of nos needed.

-just-in -time principle is used for manufacturing the industry where i worked.