Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the time required to demoulding concrete column, slabs after casting?

user-image
Question added by Peter Cheah
Date Posted: 2016/04/03
muhammmad ismail khan ismail
by muhammmad ismail khan ismail , teacher , peshawar cambrige high school sheikh muhammadi peshawar

 Normally low to medium rise buildings are desigined for gravity loads, then checked for their ability to resist lateral loads. However high rise buildings are mush more susceptible to lateral forces action, therefore the amount of materials needed for resistance of lateral forces increases at a drastically accelerating rate. Therefore in the high rise buildings still use the reinforced concrete with huge amount of steel rebars, instead of using the composite

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.