If someone is designing a layout for (33KV/11KV) substation in ETAP program , what message will appear if Power Transformers’ sides were converted?

user-image
Question added by Mohammed Almoustafa Yahya Jabir Hammd , Electrical Engineer , Gulf Industrial Services Company
Date Posted: 2016/01/19

Its colour will be changed telling us that the transformer's sides are converted.

Thiyagarajan Ravichandran
by Thiyagarajan Ravichandran , Trainee Engineer- Electrical , Refex Energy Limited

It will be highlighted in a different colour and we cant connect the next portion of SLD

Pranav Sheth
by Pranav Sheth , Senior Design Engg. , Siemens LTd.

It will not allow you to connect or it will reflect in different color than the usual one.