How we can measure the productivity in construction industry?

user-image
Question added by salwan aziz , Planner Engineer , Nasry Group of Company (NGC)
Date Posted: 2016/01/12
Wissam Jawhar
by Wissam Jawhar , Resident Engineer Project Manager , Spectrum Engineering and Consultants

How much of works done VS How much of Man-hour ,within definite period

gaurang mishra
by gaurang mishra , Site Engineer , Voltas Limited

By maintaining/incresing the turnover fixed as at time of project been booked and reducing the upcoming cost. Then by the differences of the aforesaid, our net margin will increase gradually. to reduces the costs there are several means like open tendering of various items, keeping strict watch over time vs targets, getting the best person for the job and etc..