Start networking and exchanging professional insights

Register now or log in to join your professional community.

Follow

What is the difference between Risk Assessment and Job Safety Analysis?

user-image
Question added by Mohamed Osama Abd Elfattah Ibrahim , EPC Project HSE Manager , Petrojet
Date Posted: 2015/10/15
Juned Akhtar
by Juned Akhtar , Safety Manager , AIC

Risk Assessment is examining process to find the hazards and it's appropriate precautions. Its involved in the whole project/organisation.

Where as Job Safety Analysis is to identify the specific hazards from a specific task.

Inna Selivan
by Inna Selivan , Manager , Royal Borough of Windsor and Maidenhead

Risk assessment it is a part of managing the health and safety at work. Its a cereful examination of what in a work could couse harm or hazards and deciding on suitable control measures to prevent damage, loss or injury at work.

Job Safety Analysis it is looking at the work task and concidering what is the safest way to to complete.

junaid ur rehman khan obaid ur rehman khan
by junaid ur rehman khan obaid ur rehman khan , HSE Lead Supervisor , SK E&C

Risk assessment is a systematic approach towards hazards in all activity by identifying hazards, evaluating risk, implement control measures, priorities control measures

Job safety analysis is step by step approach towards recognize, access and control hazards

Mardon Mangaba
by Mardon Mangaba , SAFETY ENGINEER , MANAZEL CONSTRUCTION COMPANY (DAR AL KHIYOUL CONTRACTING COMPANY)

Job Safety Analysis (JSA) is a procedure done to help integrate accepted safety and health principles and practices into a particular task or job operation while Risk Assessment is a systematic process of evaluating the potential risks that may be involved in a projected activity or undertaking.

Joshua.S Ekundayo
by Joshua.S Ekundayo , IBBI Production , HSE

JSA is a careful study for each step in a job, identifying the safety and health hazards at each step individually and classifying the the severity and probability (H,M,L) for each hazard , identifying appropriate controls to eliminate or reduce each hazard.

Risk Assessment is evaluation of a hazard in an incident potential matrix and determine relative risk of different hazards as a way of prioritizing.

 

JSA is the careful study of each step in a job, identify the hazards in those steps and the safety measures to avoid these hazards.

While risk assessment is an evaluation of risk at each step of an activity by classifying and identifying probability and severity.

Imran Khan
by Imran Khan , Safety Officer , Blue Star Ltd.

The Scope of both is same and it is to identify the Hazards, Evaluate the Risk and provide proper control measure to eliminate or replace the risks.

Risk Assessment is a document to identify all the possible hazards in the job and there control measures as per Risk index.

and

JHA or JSA is a document that the job is break down into small steps and identify and evaluate all the hazards and their control measure in each steps by eliminating or replacing the risk to permissible level.

Jahid Shahrugov
by Jahid Shahrugov , HSSE Loss Prevention Manager , Technip

Unlike to Job Safety Analyse the Residual Risk In Task Risk Assessment can be easy counted by Risk matrix. 

Pradeep Mohan Kumer
by Pradeep Mohan Kumer , Senior Supply Chain Executive , Corys Build Centre LLC

As per my understanding.

Job safety Analysis - This analysis helps identify if the particular job meets the safety and the principles standards, it is a step by step evaluation of the Work instructions and complete analysis of the job containing the hazard and the risk involved in it.

 

Where as 

Risk assessment - Is a process in which the entire organization is assessed for potential Hazards and risk involved for entire premises or the organization but not a in depth analysis on all job roles performed inside the organization.

Sajadh Thattarathparambil Hussain
by Sajadh Thattarathparambil Hussain , HSE Manager , Nesma & Partners Contr. Co Ltd

Risk assessment can be defined as identifying the level of risks associated with activity or operations and suggest control measures to reduce the level of risks and its commonly used for the entire activities of scope.

In other hand Job Safety Analysis is identifying hazards related to specific jobs and recommend control measures to reduce the risk and injury to the workers.

herbert flores
by herbert flores , INSTRUMENT TECHNICIAN , NATIONAL PETROLIUM CONSTRUCTION COMPANY

risk assessment is a carefull examination on your work that could cause harm to the employee and put a control measure to reduced the risk the JSA is to identify the work task and to identify the safest way to do it

More Questions Like This

Do you need help in adding the right keywords to your CV? Let our CV writing experts help you.