AS PER ONLY SAUDI ARAMCO STANDARD (pls refer standard also) clearance b/w U/G existing power cable (600V) and new Instrument U/G cable

user-image
Question added by Muhammad Abid , QA/QC , SAUDI ARAMCO
Date Posted: 2015/05/14
Anwar Ali Shaikh
by Anwar Ali Shaikh , MEP Project Manager , X cube Trading

Thirty Centimeter gap between power cable and Control or Extra low voltage cable to be provided as per NEC and Saudi Aramco standard.