Quality control of Portland cement, the test essentially done is A. setting time B. soundness C. tensile strength D .consistency all the above.

user-image
Question added by Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.
Date Posted: 2015/01/27
Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

D .consistency all the above.

Muhammad Shakeel
by Muhammad Shakeel , CAD Design Manager , M/S zeeruk Intl.

Thanks MR. Alex  ..............................Good Day

All of the Above