The most important criteria in deciding to initiate a project selection method is:

<p><strong>A. Stakeholder's vision </strong></p> <p><strong>B. Low cost opportunity</strong></p> <p><strong>C. Environmental consideration </strong></p> <p><strong>D. Capability</strong></p>

user-image
Question added by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
Date Posted: 2015/01/09
Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

C. Environmental consideration.

That's part of Projects and Strategic Planning.

Abdul Wahab Sayeed hureshi
by Abdul Wahab Sayeed hureshi , Civil Engineer , Saudi Binladin Group

C

Irina Chepel
by Irina Chepel , Personal trainer , Freelancer

Environmental consideration

Ghanendra Mishra
by Ghanendra Mishra , Social Worker , International Organization for Migration

Option C

جعفر هندي زين السقاف
by جعفر هندي زين السقاف , مهندس أستشاري , مشاريع اﻻشغال العامة

Option - c

Vinod Jetley
by Vinod Jetley , Assistant General Manager , State Bank of India

The correct answer is C.

Mukesh Varadhan
by Mukesh Varadhan , Administration Manager , M/s. Triton Health Care

It's "C".

Wolf Klaas Kinsbergen
by Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

The answer is C: Environmental consideration

My answer is choice (C) Environmental consideration

Notice: within last 2 days, Mr. Alex asked a lot of questions related to project management and sample PMP certification questions, which are looked like an interesting and highly demand field, so I highly recommend from any guys to study and become a PMP certified as a big resolution of 2015 year, GOOD LUCK.

RAJ DAHIYA
by RAJ DAHIYA , Senior MEP Projects Manager , Trinity Engineering Services L.L.C.

Environmental consideration is the most important criteria as NO ONE would like to have a project in Extreme high Seismic Zone, or where regular floods or Cyclones comes or there is unexpected soft or muddy soil below. You need your project to be secure and EVERYTHING ELSE comes LATER

Elke Woofter
by Elke Woofter , Project Assistant , American Technical Associates

I also go with C the Environment ... 