ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

The most important criteria in deciding to initiate a project selection method is:

<p><strong>A. Stakeholder's vision </strong></p> <p><strong>B. Low cost opportunity</strong></p> <p><strong>C. Environmental consideration </strong></p> <p><strong>D. Capability</strong></p>

user-image
تم إضافة السؤال من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
تاريخ النشر: 2015/01/09
Alex Al Yazouri
من قبل Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

C. Environmental consideration.

That's part of Projects and Strategic Planning.

Irina Chepel
من قبل Irina Chepel , Personal trainer , Freelancer

Environmental consideration

Ghanendra Mishra
من قبل Ghanendra Mishra , Social Worker , International Organization for Migration

Option C

جعفر هندي زين السقاف
من قبل جعفر هندي زين السقاف , مهندس أستشاري , مشاريع اﻻشغال العامة

Option - c

Vinod Jetley
من قبل Vinod Jetley , Assistant General Manager , State Bank of India

The correct answer is C.

Mukesh Varadhan
من قبل Mukesh Varadhan , Administration Manager , M/s. Triton Health Care

It's "C".

Wolf Klaas Kinsbergen
من قبل Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

The answer is C: Environmental consideration

My answer is choice (C) Environmental consideration

Notice: within last 2 days, Mr. Alex asked a lot of questions related to project management and sample PMP certification questions, which are looked like an interesting and highly demand field, so I highly recommend from any guys to study and become a PMP certified as a big resolution of 2015 year, GOOD LUCK.

RAJ DAHIYA
من قبل RAJ DAHIYA , Senior MEP Projects Manager , Trinity Engineering Services L.L.C.

Environmental consideration is the most important criteria as NO ONE would like to have a project in Extreme high Seismic Zone, or where regular floods or Cyclones comes or there is unexpected soft or muddy soil below. You need your project to be secure and EVERYTHING ELSE comes LATER

Elke Woofter
من قبل Elke Woofter , Project Assistant , American Technical Associates

I also go with C the Environment ... 

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟