Base load of a power station stands for: a 2-4 hours a day b 4-8 hours a day c 8-12 hours a day d 12-24 hours a day

user-image
Question added by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society
Date Posted: 2014/12/28
Elke Woofter
by Elke Woofter , Project Assistant , American Technical Associates

D   en.wikipedia.org/wiki/Base_load_power_plant  

Base load requirement (also baseload) is the minimum level of demand on an electrical supply system over 24 hours. 

Basit Ali
by Basit Ali , Director of Engineering , Laverda Suites & Villas / Blue Bay Resorts

Option D

Alex Al Yazouri
by Alex Al Yazouri , General Manager , Al Mushref Cooperative Society

d 12-24 hours a day.

Wolf Klaas Kinsbergen
by Wolf Klaas Kinsbergen , Managing Director, Designer , ingenieursbureau KB International NV

Where do you need it for? so it must be12-24 hours per day

RAJ DAHIYA
by RAJ DAHIYA , Senior MEP Projects Manager , Trinity Engineering Services L.L.C.

12 Hrs to24 Hrs./day

 

Ahmad Hussain
by Ahmad Hussain , Electrical Head , Acwa Power

Base load is min. load for24 Hours 