ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Which of the following statement are FALSE regarding the probability impact matrix technique?

A. An organization can rate a risk separately for each objective (i.e. cost, time, scope) B. The probability impact matrix is a tool/ technique of the quantitative risk analysis process C. Either descriptive terms or numeric rankings can be used to assign risk rankings to identified risks D. Opportunities and threats should not be evaluated in the same matrix concurrently E. The probability impact matrix specifies combinations of probability and impact that rank the risk as high, moderate and low priority

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2019/05/22
Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

B. The probability impact matrix is a tool/ technique of the quantitative risk analysis process

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟