ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Most schedule simulations are based on some form of which of the following? a. Delphi b. PERT c. CPM d. Monte Carlo Analysis

user-image
تم إضافة السؤال من قبل Zakir Muhammed , Contract Administrator , DS Contracting Co.
تاريخ النشر: 2018/05/30
Nicolas Aad
من قبل Nicolas Aad , Warehouse manager , Bassoul & Heneine Group

 Monte Carlo is used most of the time.

Mohammed Qaisar I PMP I MCIPS I MBA
من قبل Mohammed Qaisar I PMP I MCIPS I MBA , Group Procurement Manager (Civil) , Al Ghurair Construction LLC

It is nothing but Monte Carlo...

Bechir SEKRAFI
من قبل Bechir SEKRAFI , Electrical engineering of the building , Ben Slama Electric

Most companies use  MS project Software which use the PERT program "technical evaluation and review programs" in their compilation

Abdullah Muhammad
من قبل Abdullah Muhammad , Civil Engineer , Royal Marvelous Swimming Pools and Landscaping L.L.C

PERT is most scheduling technique is being used in these years

Paulina Corrales
من قبل Paulina Corrales , Subcontracting Specialist , Bacao SAS

The most schedule simulation used is the Monte Carlo predictive analysis

Syed Salim
من قبل Syed Salim , Senior Planning Engineer , Dar-Ul-Hindsaa

Monte Carlo Analysis is used for schedule simulations

M.N Sureshkumar
من قبل M.N Sureshkumar , General Manager Construction , Century Contracting Co.LLC

Project Evaluation and Review Techniques

PRAVEEN ESWARA RAO
من قبل PRAVEEN ESWARA RAO , Senior System Analyst , Dubai Municipality

Monte Carlo simulations are used to model the probability of different outcomes in a process that cannot easily be predicted due to the intervention of random variables. It is a technique used to understand the impact of risk and uncertainty in prediction and forecasting models

Muhammad Arfan
من قبل Muhammad Arfan , Sr. Site Engineer , Elite Engineering (Pvt) Ltd.

Most schedule simulations are based on CPM

Zakir Muhammed
من قبل Zakir Muhammed , Contract Administrator , DS Contracting Co.

Most schedule simulations are based on Monte Carlo Analysis

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟