ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Resource reallocation from non critical to critical activities is an example of which Project Scheduling technique?

 

A. Critical Path Method

B. Schedule Compression

C. Resource Leveling

D. What if Analysis

 

user-image
تم إضافة السؤال من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
تاريخ النشر: 2017/01/13
AMEER K m
من قبل AMEER K m , civil engineer , BUILDERS GROUP

OPTION (C)..RESOURCE LEVELING. MAXIMUM RESOURCE SHOULD PROVIDE.

ZULFIQAR ALI
من قبل ZULFIQAR ALI , Planning/ Project Control Manager , King Abdullah University Of Science And Technology

My answer is 

C. Resource Levelling

 

DR MD ANWAR HOSSAIN
من قبل DR MD ANWAR HOSSAIN , Moderator , bayt.com

Thank you for invitation. My opinion is option C.

Noxolo Lewu
من قبل Noxolo Lewu , Project Coordinator , Sanlam

The answer is resource levelling. The project manager wants to ensure that the project schedule reflects all those resource that are on a project's critical path.

Krishna   KHASANIS  PMP
من قبل Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Of course it is C - resource leveling & thanks for the invitation. 

Muhammad Umar Farooq
من قبل Muhammad Umar Farooq , IT Program Leader , Petro Rabigh

Schedule Compression, because activities are critical.

 

If resources were critical, it would be resource levelling.

Muhammad Farooq
من قبل Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.

I think option c because

Resource Leveling: Allocate scare resources to critical path activities first.

Abdul Rehman
من قبل Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thank you for the invitation. My answer is B

Syed Kashif Abbas Jaffery
من قبل Syed Kashif Abbas Jaffery , Business development and Capture Manager , LN Technology/ App maisters inc. USA

Answer is in question, it's A

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟