ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

Considering above mentioned incident ,What should you do?

You are running a project to develop the production process for a futureelectronic component. Evaluating some first test batches, you found out that the precision is generally very good, but that you have some irregular outliers in a completely unpredictable pattern.

A.  Ignore the outliers; they are not relevant as long as the yield from theproduction is sufficiently high.B.  Try to increase the accuracy of the process by adjustments, thus reducing the number of outliers.C.  Inform the designated production manager of your observations and ask him to take care after handover.D.  Research outliers, they may give you important insights into problems which may trouble later production.

user-image
تم إضافة السؤال من قبل DR MD ANWAR HOSSAIN , Moderator , bayt.com
تاريخ النشر: 2016/10/13
Ihab Zaki
من قبل Ihab Zaki , Chief Technology Officer (Cto) , EGID

I choose answer C, thanks for the invitation

mamoun mokhtar
من قبل mamoun mokhtar , general manager , albyan technical foungary

C.  Inform the designated production manager of your observations and ask him to take care after handover

Krishna   KHASANIS  PMP
من قبل Krishna KHASANIS PMP , Project Manager-Electrical , Larsen & Toubro Ltd, P T & D (International)

Thanks for the invite.

I will go with option D .

ACHMAD SURJANI
من قبل ACHMAD SURJANI , General Manager Operations , Sinar Jaya Group Ltd

my answer is C, inform what happened to your manager

ghazi Almahadeen
من قبل ghazi Almahadeen , Project Facilitator , Jordan River Foundation

Thanks for the invite ............................d

hisham abu dagga
من قبل hisham abu dagga , Project Manager / مدير مشاريع , مؤسسة عبدالكريم العواض للمقاولات

Option C 

_______Thanks for invitation_________

Abdul Rehman
من قبل Abdul Rehman , Electrical Engineer , Tamdeed Projects

Thanks for the invitation. My answer is D

MOHAMMAD MAHMOUD HASAN AL-HASHASH
من قبل MOHAMMAD MAHMOUD HASAN AL-HASHASH , مدير صيانه , شركة الاستراتيجي للتجاره

the correct answer is C and D

 

regards

Ahmed Hejazi
من قبل Ahmed Hejazi , Projects Manager , Jadat Itqan Consulting - JIC

C.  Inform the designated production manager 

AISSA OULED HADJ BRAHIM
من قبل AISSA OULED HADJ BRAHIM , رئيس مشروع , ُEco S est

je préfère la réponse : B. Essayez d'augmenter la précision du processus par des ajustements, réduisant ainsi le nombre de outliers.

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟