ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What are the advantages and disadvantages of EPC Contract?

user-image
تم إضافة السؤال من قبل Ahilan R , Scientific Assistant-D , Nuclear Power Corporation of India Ltd (NPCIL)
تاريخ النشر: 2016/07/12
Rabab Batisha
من قبل Rabab Batisha , Senior Civil Engineer , Engineering Department at Egyptian Ministry of Justice

Engineering, Procurement and Construction (EPC) contracts (or turnkey construction contracts) for complex infrastructure projects. This form of contract sets out the relationship between the owner and the contractor for the provision of professional or technical services. Under an EPC contract, the principal or owner enters into a contract with the EPC contractor, who will, in turn, enter into various subcontracts with subcontractors for the performance of specified portions of work. They will be responsible for not only the engineering aspects of the project,but also procurement of equipment and design and construction of the facility, plant project.

Vrijesh Rangoonwala
من قبل Vrijesh Rangoonwala , Padeco India Pvt. Ltd

This Contract arrangement also benefits contractors who will have more control over the design and selection of subcontractors. While contractors accept more risk with the coordination of the design, they can act more efficiently to lower construction costs.

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟