ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the best way to detail or breakdown cabling activities, in MEP projects?

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2016/04/11
Imran Ahmed
من قبل Imran Ahmed , Manager-Planning & Delay Analyst , Nesma United Industries (NUI) Saudi Arabia

The best way of breakdown for cabling is to consult the drawing electrical sections & detail and dscription of that item in BOQs.

The common breakdown is described below but it varies from project to project.

  1. Setting Out & Survey
  2. Excavation
  3. laying Electrical Pipes
  4. Laying Cable
  5. Laying cable tiles
  6. Foundation for light Fixtures
  7. Backfilling

Zain ul Abdin
من قبل Zain ul Abdin , Project Planning & Control Manager , Redco International Trading and Contracting

You mean the steps like:

  • arrival of cable in store
  • placement on rolls at site
  • laying of cable
  • termination of cable
  • final check

etc., or something else ?

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟