ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

In a hybrid system with RES how to operate the generating set when the power of the photovoltaic field does not cover all of the required power?

(the power of the photovoltaic field is not zero to boot the transfer switch)

RES: renewable energy sources

user-image
تم إضافة السؤال من قبل مستخدم محذوف‎
تاريخ النشر: 2016/02/25
Waqas Anjum
من قبل Waqas Anjum , Power Expert , Confidential

Dear Zouari

 

Good day.

If you are using cyclic batteries and have a good battery backup then you can set the battery DoD (depth of discharge) percentage value to start the generator. in this case, when solar is not providing much current then batteries will start discharge to powering the actual load and at defined DoD value the controller will give signal to ON the generator.

 

in other case you can also set and follow the voltage to start the generator.

 

If you have any question you may contact at

 

Regards

Waqas

Abdulaziz Abdelrahman Mohamed Mahmoud
من قبل Abdulaziz Abdelrahman Mohamed Mahmoud , Customer Service Sales Representative , a1 Engineering

thanks for invitation.. sorry I don't know that yet.. and I will know this from your question

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟