ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What is the use of PERT (Program evaluation and review technique)?

user-image
تم إضافة السؤال من قبل Saktheeswaran Rajendran , Mechanical Engineer , Seetech Indya Pvt Ltd
تاريخ النشر: 2016/01/13
Mohd Sheraz Lari
من قبل Mohd Sheraz Lari , Facility Manager , CBRE

It is used for Employee Appraisal. After the review , you can find the cream employees and also the trouble makers. But the KPI's set for the program should be selected after careful review.

Ramesh Sengodan
من قبل Ramesh Sengodan , Supervision , SAUDI ARABIYA (FOR M/s ABB CONTRACTING LTD):

Project management technique that shows the time taken by each component of a project, and the total time required for its completion. PERT breaks down the project into events and activities, and lays down their proper sequence, relationships, and duration in the form of a networkLines connecting the events are called paths, and the longest path resulting from connecting all events is called the critical path. The length (duration) of the critical path is the duration of the project, and any delay occurring along it delays the whole project. PERT is a scheduling tool, and does not help in finding the best or the shortest way to complete a project.  

 

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟