ابدأ بالتواصل مع الأشخاص وتبادل معارفك المهنية

أنشئ حسابًا أو سجّل الدخول للانضمام إلى مجتمعك المهني.

متابعة

What are the types of clearance and alignment measurements commonly taken during the disassemble and reassembly of a gas turbine unit?

user-image
تم إضافة السؤال من قبل Mohamed Sharkawy , Technical Support Engineer , الشركة السعودية للكهرباء
تاريخ النشر: 2013/08/23
Simon Shaibu
من قبل Simon Shaibu , Manager/Teamleader Maintenance , Aes Nigeria branch Of Aes Arlington USA

Clearances and Alignment during opening of the gas turbines 1.
Initial Accessary turbine alignment 2.
Initial Turbine Load gear alignment 3.
Turbine opening clearance 4.
Bearing1 and2 clearances 5.
compressor clearances Clearances and Alignment during closing of turbine 1.
Turbine closing clearance 2.
Bearing1 and2 clearance 3.
compressor clearance 3.
Accessory and turbine alignment

waseem waseem
من قبل waseem waseem , SENIOR MECHANICAL TECHNICIAN , Fatima Energy Limited (120 MW

1:Turbine first bucket to shroud clearance

2:Diagram seal (inter stage labyrinth seal)clearance between shaft to laby.

3:2nd stage bucket to shroud clearance.

4:liner to transition piece seal compression

5:Bearing1 and2 clearance

6:coupling float

7:check alinement

8:compressor blades clearance

9:nozzle centering2nd stage

10:barrel seal clearance

11:load gear box and accessory gear box bearing clearance and take bearing crush

المزيد من الأسئلة المماثلة

هل تحتاج لمساعدة في كتابة سيرة ذاتية تحتوي على الكلمات الدلالية التي يبحث عنها أصحاب العمل؟