Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

When it is necessary to use preliminary surveying ?

user-image
Question ajoutée par جعفر هندي زين السقاف , مهندس أستشاري , مشاريع اﻻشغال العامة
Date de publication: 2014/06/06
atul arora
par atul arora , OWNER , M.L.M.

KEEN OBSERVATION

waqas waqas shafiq
par waqas waqas shafiq , Construction Company Rahimyar

survey is a basic know how about the features of land and decided to work and construction tools and building requirement

 

Md Sahariman Kabir
par Md Sahariman Kabir , Graduate Engineering Trainee , Galacon Infrastructure & Projcets Pvt,Ltd,

Before the commencement of any survay work,the primary survey is important because of followings, the area to be survayed throughly by the surveyor, who then think the possible arrangement of the frame work of the survey. it involve walking over the area and note the various obstacles and weather or not the selected stations are visible. the main station should be selected so that it should be visible from any where of the area and enclose the whole area. formation of well conditioned traingle, the various object which are to be located. preparation of a net hand sketch indicating the main survay stations, sub survay stations, tie stations, base line,  arrangement for framework for traingles and approximate position of different objects.

hossam azzam
par hossam azzam , Fast food restaurant,s manager. , alexandria-egypt

Agree with the answer given by Mr.:Waqas

To level the area equally and to identify where cutting and filling is required. 

To check the basic amenities avaliable around the area .

جعفر هندي زين السقاف
par جعفر هندي زين السقاف , مهندس أستشاري , مشاريع اﻻشغال العامة

Essentially to use preliminary surveying  before an actual, final or decisive one. It's the first survey, meant to make the actual one easier and more-conclusive.(Aerial photography and field visit).

dijo kuriakose adukalil
par dijo kuriakose adukalil , JUNIOR ENGINEER , talal adham partners co

determining quantities and for collecting data for the designing of engineering works such as roads, railways, etc., is known as EngineeringSurvey

Justin Jacob Srambickal
par Justin Jacob Srambickal , Senior Land Surveyor , Al Hassan Engineering Co. SAOG

Before starting a project or any kind of development, a preliminary survey is required to know about the existing condition of the land, property or the subject.

Without preliminary survey, nobody can design or plan a strong, durable and cost effective realistic plan. If anybody is doing the design, projects or planning of any thing with out preliminary survey, please don't believe them and it is better to avoid them to save our money and time.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?