Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

What would be the best response if the Employer (Client) requests verbally for an additional work? Chose the options below and explain why?

Options -1. Accept that -2. Ask for a written request -3. Ask him to let you come back to him after getting feedback from management -4. Ask him to let you come back to him after getting feedback from my QS and Planner -5. Exercise No4 then No3 and then respond officially -

user-image
Question ajoutée par Tanveer Ahmad Niazi , CEO (Self-employed) , Project Management Training & Consultant
Date de publication: 2013/12/02
María Infante Chillón
par María Infante Chillón , Civil Engineer , Arco Studio

Well, I think someone has to take his own decision without getting the opinion about that situation from the QS , or the planner engineer. We will have to ask to the client for the written request for showing it to our supervisor engineer. In this way, the business owner or management of our company we are working for can dedide what can the company do in connection with that client's proposal (the suggestion for an additional work).

So I agree with Mr. Asim; the best response is option2)

Asim Gul Kazi
par Asim Gul Kazi , Divisional Manager Production (Glucose Refinery & Starch Divisions) , Rafhan Maize Products Company Mehran Plant (Ingredion Incorporated)

Option #2 Ask for written request: as most of the times, these requests are from individuals and there is no consent of management as well as when any unwanted act happens, there is no proof and no one claims the responsibility beyond contract.

 

Asim Gul Kazi

Pakistan

Tanveer Ahmad Niazi
par Tanveer Ahmad Niazi , CEO (Self-employed) , Project Management Training & Consultant

You are right Mr. Asim, but we must not miss any chance to earn more with an additional work. If we go to our management with the time and cost impact and then respond to the client in writing, no matter the (client’s) management  knows about it or not, we have a chance to earn something.

Ahmed Tarek,  PMP
par Ahmed Tarek, PMP , Construction Section Head , ARCHIRODON Construction (Overseas) Co. S.A.

Option#2 : first of all we have the role of no gold plate in project management.

2nd only formal request shall be reviewed.

Faisal Shahbaz
par Faisal Shahbaz , Project Engineer Electrical , Pakistan Power Construction

Adapt option#2 caz the actual process requires client to send a written request for change order, it should be approved by the client and vendor will be able to claim for it.                                 

Muhammad Arshad Iqbal
par Muhammad Arshad Iqbal , Services Manager , Farnek Facilities Management

It's called Scope Creep. It depends on the situation what type of additional work is requested? If that does not affect the actual work or scope and is within acceptable cost and time, then practically client should be favored. However, management should be informed. If an additional work affects majorly on scope, cost and time then a written request is better. 

A hybrid between option2 and3, as there may be easy requirements, that can be done with minimal effect on project constraints, but you need to document these somewhere, you may accept it verbally, and send a confirmation email to that. But the second case, in which will require management approval, is the case where one or more of the project constraints will be affected, and may require management to reduce profitability or agree with customer according to contract.

ELBOUAZIZI KAMEL
par ELBOUAZIZI KAMEL , Inspecteur De L’éducation Nationale , Inspection de l'enseignement primaire/Circonscription Bardo / Hrayria pour la langue française

- Demander une demande écrite.

- Demandez-lui de vous laisser revenir vers lui après avoir obtenu les commentaires de la direction.

-Réponse officielle.

 

 

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?