  • Available space
  • Wind Direction
  • Process requirements
  • Contour of plot
  • Operational Requirements
  • Maintenance requirements
  • Safety Considerations
  • Fire Hazrd
  • Process Flow
  • Degree of Automation or Human Interference

jade laos
par jade laos , site supervisor, quantity surveyor , sta. clara international corp.

  • SAFETY CONSIDERATION
  • GREEN ENGINEER ADOPTION
  • DETERMINE THE MEASUREMENTS OF THE OBJECTS
  • BEAUTIFICATION

Cesar Titong
par Cesar Titong , Waveform Designer , E - ink Company

There were some factors to consider in Plant layout and these are the some major concern to consider

 *Policies of Management

 *Plant Location

 *Nature of the Product

 *Volume of the Production

 * Availability of Floor Space

 *Nature of Manufacturing Process

 *Repair and Maintenanace of Equipment and 

       Machines.

 

John Weber
par John Weber , Head Of Operations (Multi Site) , BMB Group

(1) External Environmental Mapping (Impact of immisions on local communities, Exposure to immisions from other surrounding facilities, Exposure to the elements / climate, other environmental risks etc.)   

(2a) Location (region, locality, Land, site or building) - proximity to suppliers and customers / market - road / rail / air / sea networks and facilities.  

(2b) Shape, Layout - process flow - receiving, production, dispatching, future expansion etc.

(3) Plant and equipment requirements - now and future - automation / semi-automation / manual - opportunities to improve productivity  

(4) Nature of the product - product range variables, associated storage requirements for both materials and finished goods, transportation, contamination risk, Product safety and legislative / best practice expectations etc. 

(5) Utilities / facilities plant and equipment - location, servicing, maintenance, capacity now and future

(6) Economic considerations - Direct and Indirect internal costs (transportation, materials / finished product, cost to produce, plant and equipment etc.), local / governmental funding opportunities or economic risks etc.  

(7) People related policies, procedures and services - demographics and recruitment capability, general access and exits for both site and departments, fire safety, team structures, HR, H&S / Product Safety, Env, QMS etc.

(8) Indirect Plant, buildings and facilities - Admin, laboratory / test facilities, maintenance workshops and spares, security, parking space, Emergency / first aid, canteen, washroom facilities etc.

Each can be broken down into immense detail!

 

Ahmad Minhas
par Ahmad Minhas , JUNIOR ENGINEER , WAPDA

The Main Consideration in Plant Layout are

1) Cost

2)Area

3)Transport Facility

4) Availabilty Of Raw Material

5)Atmosphere

6)Availabilty Of Water, etc

مها الفواخيري
par مها الفواخيري , تعليمي- اشرافي , دوم

Develop the place

Make the team collaborator

organization of work

I do not accept that my place is traditionalI am trying to make the place distinctive

samira erraoui
par samira erraoui , Assistant Front Office Manager , Ezdan Hotels

Location of the site influences the choice of a particular layout.

Climate : temperature and ventilation

Safety of employees

 

 

Owen Mabumbo
par Owen Mabumbo , Design and Development Engineer , Mabumbo & Associates PvtLtd

1. Admnistrative Policies 

2. Locality

3. Nature of the product and services to be rendered

4. Capacity of production

5. Availability of space

Hala Radaideh
par Hala Radaideh , specialist in laser and skin care , Derma Pro Center

Policies of management

Nature of the product

Wind Direction

Process requirements

Fire Hazrd

Process Flow

Degree of Automation or Human Interference

Mubeenuddin Syed
par Mubeenuddin Syed , Sr. Mechanical Engineer , Dar Al Riyadh

Complete Design Drawings and Calculation are required for review of plant lay out with BOQ as addad advantage.

 

ANSARI IRFAN
par ANSARI IRFAN , Foreman or Supervisor and Operator , ADCO

AREA

SAFETY

AWAY FROM VILLAGES

AVAILIBILITY OF POWER, WATER