Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.
A. reduce the consequences of potential project risk events
B. wait until a problem actually happens, then deal with it in the most effective and efficient manner.
C.1) adjust project parameters (scope, time, quality ...),2) reduce the probability of potential project risk events,and reduce the consequences of potential project risk events.
D. reduce the probability of potential project risk events E. adjust project parameters (scope, time, quality ...)
option C is the best choice.
C.1) adjust project parameters (scope, time, quality ...),2) reduce the probability of potential project risk events,and reduce the consequences of potential project risk events.
Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?