par Vasile Dobre , Sr. Commissioning Manager , Abb - Italy

In Instrumentation and Control system - Oil and Gas  area/ plants, prior to put in function any equipment, must be check and put in service the measurement and Controlling, as instrumentation part.Logic functional test it is the test of instrument equipment in order to take decision and action of equipment through the PLC, or ICSS in conformity of the Logic block implemented in order to be safe, and to controlling the process as required. 

LIPIN JACOB
par LIPIN JACOB , Assistant Maintenance Manager , Bitumode Waterproofing Company

Cold loop testing is done without powering up, ie the wiring integrity is tested through loop resistance and continuity check. Where as the hot loop test is done by simulation of the automation controller (PLC, DCS) and the I/O, Functions etc. are tested.

Hafiz  Muhammd Tayyab
par Hafiz Muhammd Tayyab , Piping supervisor / job performer , China petroleum Engineering and construction corporations LLC

it is the test of instrument equipment in order to take decision and action of equipment through the PLC, or ICSS in conformity of the Logic block implemented in order to be safe, and to controlling the process as required. 

Mohammed Ibrahim Ali
par Mohammed Ibrahim Ali , Senior Electrical Engineer , Saudi Binladin Group

Cold Loop checking: Checking of wires continuity of respective field instrument-Junction box-DCS/PLC marshaling panel terminal.

 

Hot loop checking: Once you power up your field instrument through DCS/PLC system, by stimulating process input from respective field instrument and cross check its response at DCS/PLC system

abdolrahman khajavi
par abdolrahman khajavi , Q.C Manager , MAAD KOUSH

Hi : Dear  for cold loop testing ,we have checking all executive and activity by checklist and drawing ,

like piping , electrical  wires ,joint and connections , welding , valve ,motors, conveyors , plate form

and every equipment ,control by plane & site design . without any power and material ,gas powder,according on I.T.P project.

 

liquid ,air . nothing...

but in hot loop testing we are in real checking and tests ,in every department one by one ,under supervision of vendors ,project manager , employer , and all beneficiary guy  under QC.&H.S.E. supervision. also going for production . and we must be shore  about correction and good working all equipment and machinery.

BHARATH Chinnadurai
par BHARATH Chinnadurai , testing and maintenance engineer , Experts Energy international electro mechanical LLC

Cold loop-without power checking continued testing of cable and power cable and instruments cable i/o cable checking. hot loop-power with power line checking of voltage and current feedback and milli amps,kW,4-20.mA charging time checking ofhot loop

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?