A project manager from the quality control area is trying to categorize the number of mistakes that are made in the area that paints the right...

front fender of the Mercedes SL. She list all the possible defects on a sheet of paper and asks the inspector to make a mark each time one of the listed defects is found. This is an example of using which of the following quality tools?

a. Scatter diagram b. Statistical measurements c. Check sheet d. Random sampling

user-image
Question ajoutée par Muhammad Farooq , QA-QC MANAGER , AL Bawani contracting co.
Date de publication: 2016/05/28
Mohamed Helal
par Mohamed Helal , Project Manager , GROUP CONSULT INTERNATIONAL

.................c. Check sheet

Sathish Prabhu.V
par Sathish Prabhu.V , Manager - Operations & Process Improvement , Revolution Valves

  1. Check sheet is the right answer, because for categorizing all the possible defects, this is the right approach

sardar mardookhy
par sardar mardookhy , PMP certified Project manager , MCCI

Option C...............

thanks...........................

Eng Ahmed Elsharkawy
par Eng Ahmed Elsharkawy , Civil Engineering Project Manager , Altwijry office

thanks for invition ,,,,,,,,,, my choice is option C