What are the important contents we should put in material procurement plan before project start up?

user-image
Question ajoutée par Syed Mehdi , Material Procurement Management Specialist (Director and Advisor for Construction Projects) , Saudi Aramco
Date de publication: 2016/04/14
syed vahid
par syed vahid , Supervisor Material Control & Procurment , HEISCO

Duration of the project start and the market status of the material which we are going to purchase, wether it is in demand or not, then the requirment status of the project accourding to this we can go for whole saler or the manufacturer.

Raed Numan
par Raed Numan , Production Planning & Control Manager , Bitumat Company Limited

The delivery time  and the price for the materials ... 

Taha Mustahsan
par Taha Mustahsan , Project Engineer (Distribution) , Sui Northern Gas Pipelines Ltd

we should know the budget of the project, we should know what material are easily available at the area of the site in case of a remote area, and most importantly how much time it needs to get delivered at site. All the things should be kept in mind at the time of the startup.

Hanif Kamal
par Hanif Kamal , Store In Charge , Ismail industries

Project cost & timly delivery

Franky Lobo
par Franky Lobo , Senior Purchaser , ALBADER CONSTRUCTION AND STEEL WORKS WLL

The time of delivery should be known along with the budget cost for the material to be procured.