Communiquez avec les autres et partagez vos connaissances professionnelles

Inscrivez-vous ou connectez-vous pour rejoindre votre communauté professionnelle.

Suivre

In long running project, how a project cost may be minimized?

if project exceeded its estimated cost, How it can be managed?

user-image
Question ajoutée par muhammad Tahir , Accountant , Process Dynamics
Date de publication: 2015/09/30
Vetri Selvan Manikkam
par Vetri Selvan Manikkam , Assistant Manager -Quantity Survey , Larsen & Toubro (Oman) LLC

Take measures to improve the productivity , analyze the improvement of further profitability from other items, reduction of scope of loss items, deployment of optimum resource etc., 

Abdullah Al Mamun
par Abdullah Al Mamun , Assistant Engineer Mechanical , Power grid company of Bangladesh Limited

the first step would be to minimize the losses. To ensure the proper use of the budget every opportunity to gain any salvage money should be taken.

then the duration of the project completion shall be minimized by utilizing the proper and skilled man power.

More Questions Like This

Avez-vous besoin d'aide pour créer un CV ayant les mots-clés recherchés par les employeurs?